Heavy-duty ropeway Linth-Limmern

Solutions for Material Handling

New material ropeway

Wire ropes for heavy-duty ropeways at the Linth-Limmern pumped-storage power plant.

 

Two dedicated heavy-duty ropeways were constructed specifically for the construction and operation of the Linth-Limmern pumped-storage power plant.

The ropeways were designed to carry loads of up to 40 and 30 tonnes respectively, providing an environmentally friendly and efficient means of transporting construction materials such as concrete and steel, as well as equipment and vehicles, to the dam construction site at an altitude of 2,400 metres above sea level. At the time, these aerial tramways ranked among the largest in the world. Their exceptional payload capacity and the challenging topography made them particularly impressive in scale. For personnel transport, each ropeway was equipped with a 40-passenger cabin. The 90-millimetre track ropes were the largest-diameter track ropes ever manufactured by FATZER. The installation has since been dismantled.

  • Ropeway manufacturer Garaventa AG
  • Operator Kraftwerke Linth-Limmern AG
  • Year of construction 2007
  • Country Switzerland
  • Product INTEGRA Ø 90mm 9’000 m

Contact

Do you have any questions? We're here to help.

Portrait von Matthias Stacher

Matthias Stacher

Technical Sales DirectorLatin America, Iberian Peninsula and Africa

Related references

Your application. Our expertise.

Drawing on decades of experience, we work with you to develop the right solution for your application.