28-TGD Grindelwald Grund - Eigergletscher
Solutions for Ropeways
New 3S gondola lift
A complete package of high-performance ropes for a comfortable journey to the glacier.

The tricable gondola lift transports passengers from the village of Grindelwald to the Eiger Glacier, covering almost 6.5 kilometres in just 15 minutes.
The installation operates year-round and is used for both passenger and material transport. One of its key innovations is a fully automated material handling system: goods are transferred from the conveyor system to a vertical conveyor, which then passes them to a loading robot that automatically loads the cabin.
- Ropeway manufacturer Garaventa
- Operator Jungfraubahnen
- Year of construction 2020
- Country Schweiz
- Haul rope COMPACTA Ø56mm 2 x 6’790 m
- Track ropes INTEGRA Ø58mm 1 x 6’940 m, INTEGRA DATA Ø58mm 1 x 6'940 m
- Infrastructure ropes BRUtelecom Ø22mm 1 x 5’552 m, BRUtelecom Energy Ø29mm 1 x 1’190 m
Your application. Our expertise.
Drawing on decades of experience, we work with you to develop the right solution for your application.